Sidewalk Improvements

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print
Chaffey Crossing in Fort Smith

 

The 2023 Sidewalk Program includes 2.72 miles of new sidewalk construction and .95 miles of sidewalk repairs to provide a safer environment for pedestrians, bicyclists, and motorists in the community.


New sidewalk projects were based on input from citizens, the Board of Directors, Administration, and City staff. Citizen requests for new construction were prioritized on a rating system that considered proximity to schools, usage, existing sidewalks in the area, and constructability. These sidewalks received a grade of "good", "fair", or "poor." Only sidewalks rated as “fair” or “poor” are included on the repair list.

If you have any questions or concerns about the 2023 Sidewalk Program, please contact the Streets & Traffic Control Department:

Call: 479-784-236
Email: street-traffic@fortsmithar.gov
Fax: 479-782-0180
3900 Kelley Highway
Fort Smith, AR 72904

List of Sidewalk Improvements

The 2023 Sidewalk Program List below outlines the location, size, and order of construction for the 13 projects planned.

Download the full list

 

Maps of Planned Construction or Repairs

  • New sidewalks are highlighted in red.
  • Sidewalks that are slated for repair are outlined in blue.

 

2023 Sidewalk Program Map 1 of 3

2023 Sidewalk Program Map 1 of 3

2023 Sidewalk Program Map 2 of 3

2023 Sidewalk Program Map 2 of 3

2023 Sidewalk Program Map 3 of 3

2023 Sidewalk Program Map 3 of 3